Monitoring & Schedule Control 监督管理与时程控管
Then it also discusses the general process of schedule control, which including three steps, action preparing, process monitoring and controlling, project results evaluation.
然后讨论了项目进度控制一般过程,包括准备行动程序、过程监测与控制以及最后项目评估三个阶段并对其进行分析。
The practical construction control procedure of concrete dam construction schedule and quality is brought out based on theory of cybernetics. The scheduling and quality monitoring model is proposed.
根据控制论的基本原理,建立了混凝土坝施工进度与质量实时控制的流程,研究了混凝土坝施工进度与质量实时预警模型。
Monitoring logs, Sanitation logs, Preventive Maintenance and Sanitation Schedule are currently in-place to maintain the plant in control.
监测记录、卫生记录、保养和卫生进度计划均有到位,整个装置处于受控状态。
应用推荐