在项目的开始阶段,团队可能编制出一个完成任务所需的估算时间和人力资源的进度安排。
At the start of a project, the team probably compiles a schedule of the estimated time and person resources that will be needed to complete the tasks.
完成项目在各个设计阶段的结构计算工作,编制结构计算书。
Prepare structural calculations for projects during the different design stages.
以某海洋石油工程项目的进度控制管理为例,阐述在设计阶段网络计划的编制、设计过程中进度控制的方法和手段。
By using a real case of an offshore oil project as example, this paper presents the method and approach utilized in the process of framework planning and design stage for schedule control.
应用推荐