• 项目开始阶段团队可能编制一个完成任务所需估算时间人力资源的进度安排

    At the start of a project, the team probably compiles a schedule of the estimated time and person resources that will be needed to complete the tasks.

    youdao

  • 完成项目各个设计阶段结构计算工作编制结构计算书。

    Prepare structural calculations for projects during the different design stages.

    youdao

  • 海洋石油工程项目进度控制管理阐述设计阶段网络计划编制、设计过程进度控制方法手段

    By using a real case of an offshore oil project as example, this paper presents the method and approach utilized in the process of framework planning and design stage for schedule control.

    youdao

  • 开发建设项目水土保持监测实施细则编制深度可行性研究阶段水土保持方案中水土保持监测内容的深化对监测实施的设计

    Detailed implement rules of soil and water conservation monitor for development and construction projects is the further design of soil and water conservation plan.

    youdao

  • 方案编制将重点放在开发建设项目可行性研究阶段水土保持方案主体工程设计提出约束条件

    The plan should be made in the feasibility study stage so that restriction conditions are given by the water and soil conservation plan to the design of main part of the project.

    youdao

  • 方案编制将重点放在开发建设项目可行性研究阶段水土保持方案主体工程设计提出约束条件

    The plan should be made in the feasibility study stage so that restriction conditions are given by the water and soil conservation plan to the design of main part of the project.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定