目前,普遍采用等时间间隔发电计划曲线形成发电计划。
Several modes of realization of plan curve sending for power plants are introduced.
如上面所提到的,设计去除风险,以便项目遵从图6中所示的曲线的迭代计划的能力是检验高效的项目经理的标志。
As mentioned above, the ability to design an iteration plan that removes risk so that the project tracks the curve shown in Figure 6 is a hallmark of an effective project manager.
随着时间的推移,经营人员发现经验曲线在帮助他们制定具体的业务计划时也并完全精确。
Over time, managers came to find the experience curve too imprecise to help them much with specific business plans.
应用推荐