只要在拆除模板后及时检查,所有的表层处理问题都会得到工程师的同意并按期实施,不会延误。
Any treatment to surfaces shall be agreed with the engineer following inspection immediately after removing the formwork and shall be carried out without delay.
对大模板安装、拆除与加固以及混凝土的施工作了详细阐述。
It states in detail the installation, removal and reinforcement of lager formwork and the concrete construction.
定位模板拆除时,应水平往上抬升,防止碰坏螺栓丝扣。
When removing the positioning form, lift it up horizontally to avoid hurting screw threads of anchor bolts.
应用推荐