只要在拆除模板后及时检查,所有的表层处理问题都会得到工程师的同意并按期实施,不会延误。
Any treatment to surfaces shall be agreed with the engineer following inspection immediately after removing the formwork and shall be carried out without delay.
对大模板安装、拆除与加固以及混凝土的施工作了详细阐述。
It states in detail the installation, removal and reinforcement of lager formwork and the concrete construction.
定位模板拆除时,应水平往上抬升,防止碰坏螺栓丝扣。
When removing the positioning form, lift it up horizontally to avoid hurting screw threads of anchor bolts.
本文简要介绍快拆模板的基本构造、模板的安装与拆除、快拆原理及快拆模板的应用。
This article presents the basic structure of rapid removal formwork, its installation and removal, and examples of projects as well.
着重介绍了组拼定型大钢模板的配置、组拼、安装、拆除以及设计计算。
The equipping, assembling, installing, dismantling and designing for this formwork are introduced in detail.
解决了多层砼结构模板支撑系统的安装及拆除无依据、凭经验施工的问题。
It solved the problems of no evidence and experience dependence construction in installation and backout of formwork-supporting system for multilayer concrete structures.
解决了现有技术中存在的在混凝土浇筑过程中预留设备基础的螺栓孔洞的留设时位置不准确,模板拆除难的问题。
The problem that the position of the bolt hole for reserving the equipment foundation is not precise in the process of casting concrete in prior art, and the template is hard to detach is solved.
墙板模板安装见附图4。在模板拆除对拉螺栓拿出后,采用微膨胀水泥砂浆封堵。
Wall form installation please see attached sketch No. -4. Expended cement mortar shall be used for sealing after form dismantled and pull bolts removed.
在模板拆除对拉螺栓拿出后,采用微膨胀水泥砂浆封堵。
Expended cement mortar shall be used for sealing after form dismantled and pull bolts removed.
在模板拆除对拉螺栓拿出后,采用微膨胀水泥砂浆封堵。
Expended cement mortar shall be used for sealing after form dismantled and pull bolts removed.