居甫渡水电站大坝溢流坝段4个中墩为宽尾墩,配备4套液压滑升模板,4个宽尾墩混凝土浇筑同步施工,满足了施工进度计划和安全度汛节点工期的要求。
The concreting work of the 4 flaring piers was done simultaneously, which satisfied the requirements of both construction schedule and safely tiding over the flood period.
本文是以合面狮水电站大坝的溢流坝闸墩为研究对象。
This paper mainly studied the sluice pier of HeMianShi hydroelectric station.