• 甫渡水电站大坝溢流4个中为宽尾墩,配备4套液压滑升模板,4个宽尾墩混凝土浇筑同步施工满足施工进度计划安全度汛节点工期要求

    The concreting work of the 4 flaring piers was done simultaneously, which satisfied the requirements of both construction schedule and safely tiding over the flood period.

    youdao

  • 本文是以合面狮水电站大坝溢流墩为研究对象。

    This paper mainly studied the sluice pier of HeMianShi hydroelectric station.

    youdao

  • 本文是以合面狮水电站大坝溢流墩为研究对象。

    This paper mainly studied the sluice pier of HeMianShi hydroelectric station.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定