在实施过程中,CM方式采用阶段施工法(Phased Construction)打破了传统模式中设计与施工的线性关系,设计与施工可以在时 间上搭界,从而提高工程设计与施工的速度与效率[31。
基于28个网页-相关网页
这一方法不但很好地满足了计算速度的要求,而且也实现了考虑施工阶段边坡分析的目标。
Not only the requirement of the computing speed is met but also the slope analysis of the construction stage is achieved.
本文提出了与设计、施工、管理阶段其他手段和措施一体化的“工作分享法”;
The integration into a 'job-sharing approach' with other instruments and measures of the design, construction and management phase are proposed.
第二,在项目招投标阶段采用灰局势决策综合评估法合理选择施工单位;
Second:to adopt comprehensive evaluation of grey decision making choosing construction unit in bidding stage.
应用推荐