• 这一方不但好地满足了计算速度要求而且实现了考虑施工阶段边坡分析的目标。

    Not only the requirement of the computing speed is met but also the slope analysis of the construction stage is achieved.

    youdao

  • 本文提出设计施工管理阶段其他手段措施一体化工作分享”;

    The integration into a 'job-sharing approach' with other instruments and measures of the design, construction and management phase are proposed.

    youdao

  • 第二项目招投标阶段采用灰局势决策综合评估合理选择施工单位

    Second:to adopt comprehensive evaluation of grey decision making choosing construction unit in bidding stage.

    youdao

  • 这一方不但好地满足计算速度的要求,而且实现了考虑施工阶段边坡分析目标

    Not only the computing speed is fulfilled but also the goal of construction stage analysis is achieved.

    youdao

  • 本文采用混合分析进行空间组合结构施工阶段几何非线性稳定计算

    The paper applies the mixed analysis to calculate the geometric nonlinear stability of space composite structures at construction stage.

    youdao

  • 斜拉扣挂施工索力计算复杂,根据弯矩概念推导出节段吊装施工阶段索索力计算公式

    On the basis of conception of zero moment, we can deduce the computational formula of the tension of cable in the different construction stage of the steel tube arch ribs.

    youdao

  • 采用工程类比有限元分别设计施工阶段预测该桥基础沉降

    The engineering analogy method and finite element method are used to respectively predict the settlement value of the south anchorage foundation at the design and construction stages.

    youdao

  • 本文首次卡尔曼滤波应用悬索桥架设阶段施工控制

    In this paper the Kalman filtering method is applied to the construction control of the main cable erecting of suspension bridge for the first time.

    youdao

  • 本文首次卡尔曼滤波应用悬索桥架设阶段施工控制

    In this paper the Kalman filtering method is applied to the construction control of the main cable erecting of suspension bridge for the first time.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定