实践证明,先进的项目控制有助于降低成本,缩短建设工期,提高工作效率。
Practice showed that advanced project control can reduce cost, shorten construction period and increase wo...
钢结构建筑可以通过缩短建设工期、减少能源及材料消耗达到节省费用的目的。
Building steel structure can shorten the construction period, reduce the energy and material consumption to achieve cost saving purpose.
搞好合同管理,对提高工程质量、降低工程造价和缩短建设工期有重要的意义和作用。
Effective contract management plays a vital role on improving project quality, reducing project construction cost and time.
应用推荐