• 实践证明先进项目控制有助于降低成本缩短建设工期提高工作效率

    Practice showed that advanced project control can reduce cost, shorten construction period and increase wo...

    youdao

  • 结构建筑可以通过缩短建设工期减少能源材料消耗达到节省费用目的

    Building steel structure can shorten the construction period, reduce the energy and material consumption to achieve cost saving purpose.

    youdao

  • 搞好合同管理提高工程质量降低工程造价缩短建设工期重要的意义和作用。

    Effective contract management plays a vital role on improving project quality, reducing project construction cost and time.

    youdao

  • 利用永久井架凿井可以有效地缩短矿井建设工期。为业主带来良好的社会效益经济效益。

    Utilizing the everlasting headframe might effectively cut down the mine building construction period and had beneficial result and economic results.

    youdao

  • 潮汐电站建设中,施工起着降低造价缩短工期改善施工条件等重要作用。

    In the construction of tidal power plants, the floating caisson method may reduce the cost shorten the construction period, and improve construction conditions.

    youdao

  • 充分利用空间时间组织平行作业缩短装载系统建设工期2.5个月

    The main shaft to load the system construction work was shortened to expect 2. 5 months under well using of space and times organize homework.

    youdao

  • 工艺减免井架施工工期缩短整个矿井建设工期有一定的意义。

    The technique conduce to decrease time due to installing headgear occupy shaft alone and cut construction time of whole mine.

    youdao

  • 扩大了老坝库容节省另建设费用缩短建设工期

    Therefore, the capacity of the olod tailing store is increased, cost for a new one saved and the construction period shortened.

    youdao

  • 通过此次优化设计缩短工程建设工期半年多,节省了一亿资金取得良好社会经济效益

    The project construction time limit is cut short to over six months, near 100 million Yuan fund is saved and good social and economic benefit is obtained according to this optimization design.

    youdao

  • 介绍了大孤山铁矿矿石破碎系统建设过程中,采用垂直爆破技术挖掘破碎峒使挖掘工期大幅度缩短

    Dagushan's iron mine whose iron ore is in its third fragmentation system is in the construction process, in which the vertical deep-hole blasting technology was adopted to excavate the fragment room.

    youdao

  • 介绍了大孤山铁矿矿石破碎系统建设过程中,采用垂直爆破技术挖掘破碎峒使挖掘工期大幅度缩短

    Dagushan's iron mine whose iron ore is in its third fragmentation system is in the construction process, in which the vertical deep-hole blasting technology was adopted to excavate the fragment room.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定