大修后机组整个启动过程安全、平稳、速度快。
After retrofitting, the whole process of unit start-up becomes safe, stable and fast.
新配套或大修后第一次组装的井架,起放井架作业应在厂方的指导下完成。
Operation of lifting or laying down a new mast or overhauled mast shall be carried out under the instruction of the manufacturer's representative.
图16示意了襟翼滑轨大修后149个飞行循环内由于氢脆造成裂纹的实例。
Figure 16 shows a flap track that cracked because of hydrogen embrittlement 149 flight cycles after overhaul.
应用推荐