后墙与岩间有八条铁链相连,每逢游人云集,铁索即伸展,绷如弓弦,故有吊庙、活楼之称。
Its back wall and the crag are connected with eight shackles, that will extend, stretching like the bowstring, so it has got the name of Hanging Temple and flexible building.
工程基础采用人工挖孔嵌岩灌注桩,裙楼采用预应力平板楼盖,塔楼采用钢骨混凝土结构。
Artificial pile foundation set into rock, skirt building with prestress plane floor and tower building with steel reinforced concrete (SRC) structure are adopted in the project.
断裂带北侧楼村地区广泛出露寒武系张夏组鲕粒灰岩,鲕粒变形普遍发育。
Oolite lime of Cambrian Zhangxia group emerged widely in Loucun area north beyond the fault and oolite deformation is widely developed.
应用推荐