• 后墙八条铁链相连,每逢游人云集,铁索即伸展,绷弓弦,故之称。

    Its back wall and the crag are connected with eight shackles, that will extend, stretching like the bowstring, so it has got the name of Hanging Temple and flexible building.

    youdao

  • 工程基础采用人工孔嵌灌注桩,采用预应力平板盖,采用混凝土结构

    Artificial pile foundation set into rock, skirt building with prestress plane floor and tower building with steel reinforced concrete (SRC) structure are adopted in the project.

    youdao

  • 断裂带北侧地区广泛出露寒武系张夏粒灰,鲕粒变形普遍发育

    Oolite lime of Cambrian Zhangxia group emerged widely in Loucun area north beyond the fault and oolite deformation is widely developed.

    youdao

  • 卧室胡桃木地板,地板为石灰

    The floors on the bedroom level are walnut. The floors on the upper level are limestone.

    youdao

  • 整个湖光最高点高于湖面约90上面,湖光的整个水面一览无余

    Wang Hailou is the apogee of whole lake smooth cliff, face of prep above lake makes an appointment with 90 meters, station above, the whole surface take in everything in a glance of lake smooth cliff.

    youdao

  • 航站主体结构采用冲孔设计采用的压浆预应力管桩首次地区应用

    The bored cast in place concrete piles embedded in rock were used in the main structure. The post grouting prestressed pipe piles adopted in the design were the first time applied in the karst area.

    youdao

  • 航站主体结构采用冲孔桩设计采用的预应力管桩首次溶地区应用。

    The bored cast in place concrete piles embedded in rock were used in the main structure. The post grouting prestressed pipe piles adopted in the design were the f...

    youdao

  • 航站主体结构采用冲孔桩设计采用的预应力管桩首次溶地区应用。

    The bored cast in place concrete piles embedded in rock were used in the main structure. The post grouting prestressed pipe piles adopted in the design were the f...

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定