后墙与岩间有八条铁链相连,每逢游人云集,铁索即伸展,绷如弓弦,故有吊庙、活楼之称。
Its back wall and the crag are connected with eight shackles, that will extend, stretching like the bowstring, so it has got the name of Hanging Temple and flexible building.
工程基础采用人工挖孔嵌岩灌注桩,裙楼采用预应力平板楼盖,塔楼采用钢骨混凝土结构。
Artificial pile foundation set into rock, skirt building with prestress plane floor and tower building with steel reinforced concrete (SRC) structure are adopted in the project.
断裂带北侧楼村地区广泛出露寒武系张夏组鲕粒灰岩,鲕粒变形普遍发育。
Oolite lime of Cambrian Zhangxia group emerged widely in Loucun area north beyond the fault and oolite deformation is widely developed.
卧室楼层为胡桃木地板,二楼的地板为石灰岩。
The floors on the bedroom level are walnut. The floors on the upper level are limestone.
望海楼是整个湖光岩的最高点,高于湖面约90米,站在上面,湖光岩的整个水面一览无余。
Wang Hailou is the apogee of whole lake smooth cliff, face of prep above lake makes an appointment with 90 meters, station above, the whole surface take in everything in a glance of lake smooth cliff.
航站楼的主体结构采用嵌岩冲孔桩,设计中采用的后压浆预应力管桩是首次在岩溶地区应用。
The bored cast in place concrete piles embedded in rock were used in the main structure. The post grouting prestressed pipe piles adopted in the design were the first time applied in the karst area.
航站楼的主体结构采用嵌岩冲孔桩,设计中采用的后压浆预应力管桩是首次在岩溶地区应用。
The bored cast in place concrete piles embedded in rock were used in the main structure. The post grouting prestressed pipe piles adopted in the design were the f...
航站楼的主体结构采用嵌岩冲孔桩,设计中采用的后压浆预应力管桩是首次在岩溶地区应用。
The bored cast in place concrete piles embedded in rock were used in the main structure. The post grouting prestressed pipe piles adopted in the design were the f...
应用推荐