升船机是三峡水利枢纽工程的主要通航建筑物之一。
The ship lift is one of the navigation facilites of the Three Gorges Project on the Yangtze River.
在高水头的通航建筑物中,升船机的造价通常低于船闸。
In the navigation buildings of high water head, the cost of ship lift is generally lower than ship lock.
本文介绍这些通航建筑物的布置、尺寸,主要工程量和工程进度安排。
This paper presents the layouts, dimensions, main work quantities and job schedules of these structures.
三峡水利枢纽主要由拦河大坝及泄洪建筑物、水电站、通航建筑物组成。
The main structure of the Three Gorges project consists of the water impounding dam, flood releasing installations, power plants, and navigation facilities.
通过大源渡枢纽通航建筑物的整体模型试验,为其优化布置和通航条件设计提供了依据。
The overall model test of Dayuandu Junction navigation structures provided a basis for the optimized arrangement and navigation condition design.
本文基于某电航枢纽整体模型试验,研究船闸导航建筑物实体和透空结构型式对通航水流条件的影响。
The paper studies the influence of solid mass and permeable structure of navigation lock guidance structure to navigation flow condition based on integral model test of power and navigation complex.
本文基于某电航枢纽整体模型试验,研究船闸导航建筑物实体和透空结构型式对通航水流条件的影响。
The paper studies the influence of solid mass and permeable structure of navigation lock guidance structure to navigation flow condition based on integral model test of power and navigation complex.
应用推荐