• 主要预处理构筑物一般采用格栅、等。

    The main structures usually considered are screens, grit tanks and settling basin.

    youdao

  • 本文讨论了城市污水处理厂提升泵房、沉砂池、二污泥消化设计运行中的几点经验。

    Based on describing the principal contents of the system structure design and operation design, this paper analyses the system organizing principles.

    youdao

  • 结合工程实例,指出现行流式设计规范存在问题探讨影响平流式沉砂池沉砂效率的因素,提出了可供选择设计方法。

    In the light of a practical example, this article points out the existing problems with the design standards of horizontal flow type grit chamber, and discusses the factors affecting the grit deposit.

    youdao

  • 结合工程实例,指出现行流式设计规范存在问题探讨影响平流式沉砂池沉砂效率的因素,提出了可供选择设计方法。

    In the light of a practical example, this article points out the existing problems with the design standards of horizontal flow type grit chamber, and discusses the factors affecting the grit deposit.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定