本系统在某县三个变电站投运7个月以来,效果良好。
This system has been running safely for 7 month, and achieved desired result.
自2005年投运以来,逐渐出现了一些由于设计原因产生的缺陷。
Some design defects occurred since it was put into operation in 2005.
自2005年投运以来,逐渐出现了一些由于设计原因产生的缺陷。
Some design defects occurred since it was put into operation in 2005.
应用推荐