目前该项目基础设施建设、厂房已结束,船台舾装码头已投入使用。
So far the construction of infrastructure and workshops has finished, and the shipways and fitting-out berth have gone into operation.
我们的舾装码头有四个泊位,可停泊10万吨级散货轮船,海工平台及特殊工程船舶。
We have 4 berths which can berth bulk carriers over 100000 DWT, also can berth Marine platforms and special project ships.
照片里这条船是条新造船,下水后码头舾装到试航大概用了2个多月时间。
Theboat in the picture is a new ship, and it took about 2 months from outfitting to trial trip.
照片里这条船是条新造船,下水后码头舾装到试航大概用了2个多月时间。
Theboat in the picture is a new ship, and it took about 2 months from outfitting to trial trip.
应用推荐