高炉开炉是新建或大修后的高炉投入炼铁生产时进行的操作。这是一项重要的高炉操作,它关系到高炉是否能在规定的时间内顺利达到额定经济技术指标和一代炉役的寿命。
应用该软件对武钢6号高炉进行开炉装料计算,实现高炉开炉的最优配料。
Blast Furnace of WISCO. As the result, the best BF burden distribution is realized.
分析柳钢2号高炉开炉以来的生产实践,总结提高技术经济指标的主要措施。
Production practice after blowing on of No. 2 Blast Furnace was analysed, and the main countermeasures for improving the technical and economic index were summarized.
介绍了鞍钢新4号高炉、热风炉及除尘系统的结构特点及开炉后的生产实践。
The structure characteristics of the main body, hot stove and clean catching system of Angang new No. 4 BF and the production practice of which after blow-in are presented.