为此,需将旧的高桩梁板码头拆除。
So, the existed high-piled slab &beam wharf shall he demolished.
介绍高桩梁板码头拆除方案的设计及施工,重点分析岩质海岸地质条件下预制桩的拆除方案。
This paper describes the design and construction of the demolishing scheme of the high-piled wharf, and analyzes mainly the demolishing scheme of precast piles under rocky coast.
应用推荐