第十五条轨道交通工程竣工后,轨道交通项目建设单位应当按照设计标准组织工程初验。
Article 15 Upon the completion of CRC engineering, the CRC project construction unit shall, according to the design standard, organize the preliminary testing of the engineering.
本发明提供一种穿刺装置,为了从受验者的穿刺部位抽取组织液而穿刺所述受验者的皮肤,该穿刺装置包括:计时器;
A puncture device which punctures a skin of a subject for extracting a tissue fluid from a puncture site of the subject. The puncture device included a timer;
应用推荐