应用数值分析和计算几何理论,根据船体首部线型特点,建立首柱轮廓线数学模型;
Applying theories of numerical analysis and higher geometry, the corresponding mathematical model of stem line is established according to different stems.
首节钢柱与原下部混凝土柱的连接问题及对策。
Question and countermeasure presented when being connected with concrete of original under-part and first steel column.
1996年任楼煤矿首采面曾因隐伏导水陷落柱突水,引发淹井灾害,造成3.5亿元的重大经济损失。
Because of water outburst by hidden conducting Karst collapse column at the mining area of Renlou coal mine, the flood was caused in 1996, which causes losses up to 3.5 hundred million yuan.
应用推荐