例如,一个被提议的进度变更常会影响成本,风险,质量和人员构成。
For example, a proposed schedule change will often affect cost, risk, quality, and staffing.
南欧人所面临着更高的借款成本反应了他们承受的风险,这构成了一个合理的均衡。
Southern Europeans faced a higher cost of borrowing to reflect their risk, and this was a reasonable equilibrium.
结果表明:由质量、进度、成本、安全、环保、风险六大管理目标构成的目标体系是科学、全面管理工程项目的重要保证。
The results show that the project management objective system with quality, schedule, cost, safety, environmental protection and risk can manage projects scientifically and comprehensively.
应用推荐