开发人员与评审人员一起执行1到2个小时的注释预排,并为每一个注释达成一致的行动计划。
The developer performs a 1 - to 2-hour walkthrough of the comments with the reviewers and reaches consensus on an action plan for each comment.
开发人员为评审人员执行1到3个小时的代码预排。
The developer performs a 1 - to 3-hour walkthrough of the code for the reviewers.
应用推荐