为预备可再生能源发电中出现的发电量波动,我们需要储备过剩的电能以保证多云、无风的午后和夜晚的用电。
To prepare for the power fluctuations endemic to renewable energy, we'll need to inventory excess power to use during cloudy, windless afternoons and nights.
其次,建立医院应对传染病的预备状态,包括人力资源和物质资源的储备。
Secondly, the hospital should be prepared for the infectious disease outbreak, including the reservation of human resources and material resources.
应用推荐