预先制造的 prefabricated
预制构造 prefabricated construction
预先制造 prefabricate
预制混凝土构造 precast concrete construction
预计制造数量 Start QTY
制造费预算表 manufacturing expense budget report
预定制造费用分配率 Predetermined factory overhead rate
预计制造费用分摊率 budgeted factory overhead rate
预定制造费用 [会计] predetermined factory overhead
这则新闻是说预制造一个57层高楼的结构模块花了很多时间,只是组装在19天内就完成了。
It says fabrication of the modules worthy of building a 57 story skyscraper took that much time, just the assemblage was done in 19 days.
那不是建设,而是一层一层组装预应力梁构件和预制造模块的过程。预制造的时间并没有算在建设工期内。
It is not building, but, assembling the prestressed beams or prefabricated moulds, floor by floor. Fabrication does not come into the time frame.
他们受雇于建筑公司,水泥和混凝土承包商和预制混凝土产品的制造商,或者他们可能成为自雇人士。
They are employed by construction companies, cement and concrete contractors and manufacturers of precast concrete products, or they may be self-employed.
应用推荐