详细介绍了对双导梁式架桥机天车、行走系统、有效工作长度及预制梁安装就位的改进情况。
The text detailedly introduced crown block, running system, availability work period of bridge girder erection equipment and improve case for precast beams install.
后张无粘结预应力筋适用于大跨度、大开间建筑的现浇楼板、大荷载的预制梁及其他特种结构。
Post-tensioned unbonded Prestressed concrete bar is suitable for cast-in –Place concrete of Long –span and Wide buildings, Large load Prefabricated beam and other construction.
采用起重机吊装预制梁,具有施工机具简单、易于操作、成本低、工期短、质量安全易于保证等优点。
Using crane to hoist and construct bridge is characteristic of simple in constructional machines, easy in operation, low in cost, short in construction time, safety and good quality.
应用推荐