预制混凝土柱和空心屋面板构成了建筑的结构系统。
The structure is defined by a system of precast concrete porticos and hollow core slab roofing.
采用的连接方式能将预制墙板、现浇柱及地梁连接成整体。
The adopted connections of the specimens integrate the pre-cast wall panel, the cast-in-site column, and the foundation as an unit.
海上墩柱整体预制吊装在我国第一座外海桥梁东海大桥非通航段施工中得以研究和全面应用。
The technique of pier integral precasting at the sea was researched and applied in the innavigable section construction of Donghai Bridge(the first bridge at the sea in China).
应用推荐