这就要求系统能对事务的执行进行预分析与预安排。
This requires that the system preanalyze and preplan the execution of transactions.
因此有必要对嵌入式实时事务进行有效预分析和预处理,以支持实时事务实现定时限制。
So it is necessary to make efficient preanalysis and preprocess on the em-bedded real-time transactions for supporting the implementation of real-time transaction's timing constraint.
最后考虑已有的大气温度场的测试资料,对主缆施工阶段的温度效应问题进行了预分析。
Finally, considering the existing atmosphere filed data, the temperature effect of main cable under construction is pre-analyzed.
应用推荐