为了满足海上调平和灌浆的要求,东海平湖油气田平台导管架采用了液压卡桩器和封隔器组合件。
The packer assembly and skirt pile grippers were selected for the Pinghu jacket due to offshore leveling and grouting requirements.
对静压桩进行了隔时复压试验和静载试验,静压桩的极限承载力随时间呈双曲线增长。
The re-pressed tests to statically pressed pile after different times, as well as the ordinary pile bearing capacity tests were performed.
本隔震独桩平台结构简单,隔震减震效果好,工作寿命长,安全稳定性较好。
The shock isolating independent pile platform has the advantages of simple structure, favorable shock insulating effect, long service life, safety and better stability.
应用推荐