加速防止山泥倾泻计划 Accelerated Landslip Preventive Measures Project ; Project
一九九八年内,防止山泥倾泻计划共动用7.74亿元,以期增加每年完成斜坡巩固工程的数量。
During 1998, a total of $ 774 million was spent on the LPM Programme to increase the annual output of slope upgrading works.
鉴于不符标准的私人斜坡数目日增,屋宇署已增强人手,处理在防止山泥倾泻五年计划中经鉴定不符标准的私人斜坡。
Manpower has been strengthened to deal with an increasing number of substandard private slopes identified in the five-year Landslip Preventive Measures Programme.
应用推荐