被描绘钢碟子,形成基础桥,轮廓的被进入地面之内驾驶15公尺而且进入盖上被单机器的一个巨大振动的石灰石岩床之内驾驶还有3公尺。
Profiled steel plates, forming the foundation shaft, were driven 15 metres into the ground and a further 3 metres into the limestone bedrock by an enormous vibrating sheeting machine.
投手碟子是用6毫米(3个规格)钢做成的而且是锌镀金的瓷漆涂上一层的。
Caster plate is made of 6mm (3 gage) steel and is zinc plated lacquer coated.
应用推荐