板墙筋竖筋分二次绑扎,第一次从底板留出插筋至止水钢板上口留出,搭接倍数,第二次绑扎至顶板面。
Two-time-binding is required for vertical re-bar of plank wall. First binding is made up to water stop plate, second binding is made up to top plate surface.
文章重点介绍了大型船坞止水墙钢板桩工程施工方法。
This paper mainly introduces the construction methods of steel sheet pile of water sealing wall of large-size dock.
应用推荐