最终开采量 ultimate production ; ultimate recovery
地下水开采量 amount of groundwater mining ; groundwater withdrawal
总开采量 gross recovery
待发现潜在可采量 undiscovered potential recovery
剩余总开采量 remaining ultimate recovery
随后开采量 follow-up production
开采量表 proration schedule
探明可采储量 verified reserves exploitable ; proved recoverable reserves
开采量较少 Mining is less ; Extraction less ; Less mining
开采量调查 investigation of groundwater exploitation
最后,依据评价结果建立了不同开采条件下大武水源地可采量预测模型。
The predictable model of the safe yields is set up finally about Dawu water supply base under various pumping conditions according to the results obtained from the calculations above.
应用效果表明了煤层气抽采钻孔封孔技术优化,能达到提高煤层气抽采浓度和抽采量的目的。
The results of optimization of sealing technology for CMM boreholes have indicated that aim of improving the concentration and quan…
针对本工程为重型钢结构,对厂房采双层格构式刚性支撑方案,单位面积用钢量节省10%左右。
For this project is a heavier steel structure, plant production double-layer lattice rigid support scheme, the amount of steel per unit area save about 10%.
应用推荐