融合项目期限连同船员尺寸是采用表3所示。
The converged project duration together the crew size used is shown in Table 3.
采用表和具体示例的形式沟通业务需求可以帮助您了解所需内容。
Business needs are communicated in the form of tables and concrete examples help you understand what's required.
塘仙引水坝为双曲拱坝,溢流坝布置在河床中部采用表孔挑流消能。
The Tangxian diversion dam is double_curved arch dam. Its layout adopted the surface hole deflecting energy dissipation.
应用推荐