采剥工程断面图 [矿业] striping and mining engineering profile
采剥比 [矿业] stripping ratio
经济合理采剥比 economic stripping ratio
采剥工程综合平面图 [矿业] synthetic plan of striping and mining
露天剥采 Strip mining
采剥进度 mining-stripping advance
采剥系统 mining and stripping system
采剥关系 relation between mining and stripping
露天矿采剥计划 open-pit mining and stripping planning
剥采比 stripping-to-ore ratio
CAD生产过程模拟;通用采剥计划。
CAD simulation of operation processes and general production scheduling.
露天矿生产过程中,需要及时提供采剥工程平面图。
It is necessary that stripping plan be timely provided during the opencast mining.
本文对露天矿调整采剥进度计划,降低生产成本,提高企业效益作了阐述。
This article illustrates how open pit mine adjusts the striping schedule so as to lower down production cost and improve enterprise benefits.
应用推荐