在有多个作业队列的系统上,对连续作业处理进行假脱机要求把所有作业转发到同一个作业队列设备。
Spooling sequential job processes on a system with multiple job queues requires that all jobs be directed to a single job queue device.
建筑施工是一个多工种、多工序、立体交叉、连续作业的系统工程。
The construction is systems engineering with multi-type, multi-process, interchange and continuous operation.
该装置由中央控制系统和PLC控制器进行两级控制,实现全系统的自动连续作业。
Controlled by central control system and PLC controller, the system can operate automatically and continuously.
应用推荐