夹镊所需要的力量很小适合连续作业。
The power of tweezers that folder required is suitable for continuous operations.
特殊施工阶段实施24小时连续作业,工人工作实行三班制。
In special construction stage, 24 hours continuous work will be executed and three-shift work system to be carried out.
建筑施工是一个多工种、多工序、立体交叉、连续作业的系统工程。
The construction is systems engineering with multi-type, multi-process, interchange and continuous operation.
应用推荐