为期2个月的过渡周期之后,洛·马公司将于6月1日开始运作。
Following a two-month transition period, Lockheed Martin will begin operations June 1.
采用波形控制方法对熔滴过渡周期进行控制,同时软件还对时序系统和送丝速度进行精密渐变控制。
The droplet transfer cycles were controlled by wave control method. Also gradual adjustment of the sequential and wire feed rate was controlled by software.
他的任务是控制通胀(平滑过渡经济周期),保护金融体系,和阻止衰退转为萧条。
Its task is to keep inflation down (helping smooth out the economic cycle), to protect the financial system, and to prevent a recession turning into a deep slump.
应用推荐