综合工区:负责所有机械设备的维修、保养以及本项目的辅助工程施工等管理工作。
Complex processing area: be responsible for repair and maintenance of all mechanical equipment, construction of the project's ancillary works and other management work.
超前小导管注浆加钢支撑是隧道工程辅助开挖的一种施工工艺,特别适用于地质条件不良的隧道施工。
The pump pouring liquid with the supporting of steel by a small pipe is one of the add craft in tunnel construction and it is fit for tunnel project in bad geology condition.
在施工阶段,脚手架工程是建筑物或构筑物在施工时必须发生的辅助项目,工程中常用的脚手架类型很多。
During the construction phase, the scaffold project is a building or structure must occur during the construction of auxiliary project, that is commonly used in engineering scaffold type a lot.