我们有远见的方法和无与伦比的超前工程设计经验允许我们的工作贴近设计者、室内装饰设计者、船厂的要求,并把这些想法变成现实。
Our forward-thinking approach and unrivalled state-of-the-art engineering experience allows us to work closely with designers, stylists and shipyards, and bring these ideas to life.
尤其是对于TBM施工隧洞,超前地质预报工作开展的好坏是工程能否成功建设的关键。
Especially, to the tunnels constructed by TBM (tunnel Boring Machine), the work for advance geological prediction is crucial to the successful construction of a project.
在地压作用下,冻结壁产生超前位移,进而引起工作面的底臌。
Frozen wall produces advanced displacement on the action of ground pressure, and then the rise of working surface has happened.
应用推荐