...What does water diversion project mean for Han River basin 关键词:水质模拟;MIKE11 ;污染负荷;调水工程;水华 [gap=1894]KEYWORDS Water quality modelling; MIKE 11; pollution load; water diversion project; algae bloom..
基于46个网页-相关网页
南水北调工程 the South-to-North Water Diversion Project ; The South-to-North Water Diversion Project ; South-to-North water diversion project ; South-to-North Water Transfer Project
跨流域调水工程 Trans-valley water diversion projects
加利福尼亚州调水工程 California State Water Projoct
魁北克调水工程 Quebec Water Transfer Project
加州水道调水工程 California State Water Project
莱索托调水工程 Lesotho Highland Water Project
南水北调西线工程 western route of water diversion from South to North ; western route project of the South-to-North Water Transfers
南水北调工程资料 South-North water transfer project information ; South-to-north water diversion project information ; Water diversion project information
Combining failure probability with calamity consequence of interbasin water transfer project ,the risk assessment system of water transfer project has been proposed.6.
5、综合跨流域调水工程的失效概率和失效后果,提出了调水工程系统风险的评价体系。
参考来源 - 跨流域调水工程系统风险评估的基础性研究In water diversion project, unsteady flowusually happened with flow changing, in which hydraulic pressure, water depth,discharge and velocity changed with time.
调水工程的非恒定流现象通常发生在流量调节情况下,它的压力、水位、流速和流量等水力参数随时间发生急剧的变化。
参考来源 - 长距离输水系统的非恒定流特性研究Accordingly, the construction schedule of IWDP was optimized.3. The three-dimensional visual dynamic analytical approach for construction scheduling was presented, which can describe complicated space-time logical relationship clearly in the construction phase of IWDPs.
3、提出了基于横道图的施工进度三维动态可视化分析方法,可以直观地描述调水工程施工过程中复杂的时空逻辑关系,通过施工面貌与进度计划的交互分析,对于发现潜在的施工时空冲突和优化施工进度具有重要作用。
参考来源 - 跨流域调水工程施工进度优化与控制研究There are a variety of uncertain and complicated ventures during the construction of a large-scale water-transfer project.
在大型调水工程项目建设实施过程中,存在着各种各样的复杂多变的风险。
参考来源 - 基于风险评估的大型调水工程保险费率的确定·2,447,543篇论文数据,部分数据来源于NoteExpress
在分析调水工程水量调度特点的基础上,确定了调度图的形式及其优化方法。
The Operation Guide Curves for the project, one multiple cascaded reservoirs system, and their optimization are discussed based on the analysis of the project features …
近年来湿地的生态环境恶化,文章介绍了扎龙湿地应急调水工程的建设与管理。
The entironment of marsh is worsening in the near years. The paper introduces the construction and the management of emergency transferring water project to Zalong marsh.
在大规模的调水工程的建设中穿越软土地区的浅埋输水隧道的抗震性能问题更加突出。
The aseismic performance of shallow buried water-conveyance tunnel in soft soil area is becoming more and more important with the development of large-scale water conveyance projects.
应用推荐