但是,我认为由于这些详细的估计和进度表,这里存在大量错误的信心。
But I think there's a lot of false confidence that gets built up by these detailed estimates and detailed schedules.
看看时间进度表,ASDI非常担心我们用了一半的时间,却仍然在进行详细的设计。
Looking at the schedule, ASDI was very concerned that we were almost halfway through the project yet still performing detailed design.
为每个阶段设置准确而详细的退出标准对于管理整个开发进度表是十分重要的。
Setting accurate and specific exit criteria for each phase is important to managing the whole development schedule.
应用推荐