据调查,加藤在静冈一家工厂工作。该工厂计划裁员,把临时工的数量由200人减至50人。
According to investigators, the factory where Kato worked in Shizuoka Prefecture was planning to reduce the number of temporary workers from about 200 to 50.
该文结合工程介绍了该工法的结构形式、施工方法和技术特点。
This paper introduces the form of structure, construction method and technical feature of it.
该工法包括回填和固结灌浆、管棚加固、控制爆破和喷锚等工序。
This method consists of the following procedures: backfill, consolidation grouting, reinforcing by the pipe and strut method, controlled blasting and anchor bars.
应用推荐