利用空气介质中电晕放电理论对高压电缆局部放电试验连接导线进行了改进。
The connecting wire used for the PD test of HV cables was improved based on the corona discharge theory in air medium.
在力学试验中,采用了倒v型绝缘子串的横担侧挂点固定、导线侧加力的方法。
In the mechanic testing, the method of backward V insulators with the side fixing of cross-arm and adding force on side of wire was adopted.
通过河工动床模型试验,对沿治导线布设形式的透水桩坝在黄河下游控导河势的效果进行了研究。
The effects of permeable pile groynes laid out along the thalweg in control and guide the regime of the lower Yellow River have been studied through movable bed model tests.
应用推荐