在试运期间进行了负荷扰动试验和电网AGC试验。
Load disturbance test and AGC test were carried out during test operation.
对阀进行了试运和串漏、外漏检验,结果表明:阀密封良好,无漏液现象。
Test run and inspection showed there were no series leak or external leak and the seal property of the valve was perfect.
介绍了外高桥电厂2号机组的协调控制系统方式及试运情况,运行状况良好。
The coordinating control system and the pre commissioning operation of the Waigaoqiao Power Plant's No. 2 unit are described.
应用推荐