最后进行施工结构打点试桩,在经过地质监理工程技术人员的检验合格后方可施工。
Finally, the construction of the construction of the test pile, in the geological supervision of the engineering and technical personnel after the construction of qualified.
如何利用未达到破坏的试桩资料确定单桩极限承载力是一个重要的工程问题。
It is important for engineers to determine the ultimate bearing capacity of single piles through non-destructive field test.
如何利用现场抗拔静载试验中未达到破坏的工程试桩数据来确定其抗拔极限承载力是一个重要的工程问题。
It is very important for engineer to determine the uplift ultimate bearing capacity by using the data of non-destructive test of pile.
应用推荐