本文运用模糊数学理论,提出一种利用既有工程数据库设计隧道围岩支护系统的“模糊类比”方法。
Based on fuzzy sets theory and tunnelling data bank, a fuzzy analogy method for design of rock support system in tunnelling is presented in this paper.
为了建造长达4.4万英里的公路、桥梁和隧道网络,必须设计出数百种独特的工程设计和解决方案。
To build its 44,000-mile web of highways, bridge and tunnels, hundreds of unique engineering designs and solutions had to be worked out.
为了建造长达4.4万英里的公路、桥梁和隧道网络,必须设计出数百种独特的工程设计和解决方案。
To build its 44,000-mile web of highways, bridges, and tunnels, hundreds of unique engineering designs and solutions had to be worked out.
应用推荐