货主:装运前每一台机器都经过严格检查,我认为一定是运输途中海上潮气导致的。
Cargo Owner: Every machine has been inspected strictly before loading. So I believe that rust must have occurred in transit by dampness at sea.
按照合同,在收到第一次装运通知后,请贵方在10日内在中国银行开立以我方为台头人的相关信用证。
According to the contract, after receipt of the preliminary shipping advice, you are kindly requested to open with the Bank of China the relative L/C in our favour within ten days.
应用推荐