Simulations on icicle-melting under conditions of different heated temperature, horizontal air velocity and contact area of icicle and air were performed, and the melting time was obtained.
通过对冰柱排在不同受热温度、水平风速、冰柱与空气接触面积和送风温度的情况下进行的数值模拟,得到冰柱在不同工况下的融化时间。
参考来源 - 受热面上冰柱排的融化机理研究·2,447,543篇论文数据,部分数据来源于NoteExpress
混凝土吸入溶液量随融化时间的增加而迅速降低,直到达到平衡;
The solution absorption in concrete is obviously reduced with the increase of thawing time until reaching equilibrium.
煤烟的污染导致高原的积雪融化时间逐年提前,到了夏季,处在下游的农作物就会缺少水分。
Soot on snow causes the plateau's annual snowpack melt to happen sooner each year, causing farmers below it to have less water for their crops in the summer.
数值结果表明,在融化区上部发生较强烈的自然对流,融化界面与水平线倾角随融化时间越来越大。
Numerical results show that natural convection is strong on the top of the melting region and angle between melting interface and horizon increases with melting time.
应用推荐